Skip to content

Melbourne and regional Victoria

Waterproofing for wet areas, balconies and retaining walls across Melbourne. Domestic, commercial and industrial work.

Shieldmate Waterproofing builds the membrane, falls and junctions that keep water where it belongs. Each layer has one job. A fault in one layer shows up in the layers above it.

How it is built

A waterproof floor is a stack of layers

Each layer has one job. A fault in one layer shows up in the layers above it.

Section detail: wet area waterproofing01 Substrate. Concrete checked for soundness, moisture and falls before anything is applied. 02 Primer. Seals the substrate so the screed bonds to it. 03 Screed. Mortar bed laid to fall to the waste, so water runs off rather than ponding. 04 Bond breaker. Fillet in the wall and floor junction, set on the screed, so the membrane can bridge the corner without tearing. 05 Membrane. Liquid-applied membrane follows the falls, turns up the wall and bridges the fillet. 06 Tile and adhesive. Tiles go down only after the membrane has cured and passed a flood test.060504030201
  1. 01Substrate

    Concrete checked for soundness, moisture and falls before anything is applied.

  2. 02Primer

    Seals the substrate so the screed bonds to it.

  3. 03Screed

    Mortar bed laid to fall to the waste, so water runs off rather than ponding.

  4. 04Bond breaker

    Fillet in the wall and floor junction, set on the screed, so the membrane can bridge the corner without tearing.

  5. 05Membrane

    Liquid-applied membrane follows the falls, turns up the wall and bridges the fillet.

  6. 06Tile and adhesive

    Tiles go down only after the membrane has cured and passed a flood test.

  1. 01

    Substrate

    If the substrate is damp, cracked or not laid to fall, nothing applied on top will stay sound.

  2. 02

    Primer

    The primer seals the surface so the screed bonds to the slab and not to dust.

  3. 03

    Screed

    The screed sets the falls, so water runs to the waste instead of sitting on the floor.

  4. 04

    Bond breaker

    It lets the membrane bridge the corner where the wall meets the floor without tearing when the building moves.

  5. 05

    Membrane

    This is the layer that stops water, so its thickness and cure time decide whether it holds.

  6. 06

    Tile and adhesive

    Tiles go down only after the membrane has cured and passed a flood test, so a leak shows before it is hidden.

Process

How a job runs

From the first call to a tested finish, in this order.

  1. 1

    Tell us about the job

    Call 0488 213 088, email shieldmatewaterproofing@gmail.com, or send the form on the contact page. Tell us the area, what is there now and what you are planning.

  2. 2

    We look at the site

    We check the substrate, the falls, the outlets, the junctions and any existing membrane. Where there is a leak, we trace the water path before we recommend a repair.

  3. 3

    We explain what it needs

    You get the scope in plain terms: the membrane, the detailing and the order the work happens in. If there is more than one sensible option, we set them out.

  4. 4

    We prepare and coat

    The surface is cleaned, repaired and dried. Junctions and outlets are detailed first, then the membrane goes on in coats, with each coat cured before the next.

  5. 5

    We test before finishing

    The area is flood tested before tiles, pavers or screed go over the membrane. Finishing starts only once the membrane has cured and held the water.

Questions

Common questions

Short answers to what people ask before a job starts.

All questions

What areas do you cover?

Melbourne and regional Victoria. We do domestic, commercial and industrial waterproofing across that area.

How do I get a quote?

Call 0488 213 088, email shieldmatewaterproofing@gmail.com, or use the quote form on the contact page. Tell us where the job is, what it involves and what is wrong now, if anything is.

Do you work on homes as well as commercial and industrial buildings?

Yes. The residential and commercial and industrial pages list the work we do for each, and the service pages go into the detail.

Are you fully qualified?

Shieldmate Waterproofing is listed as fully qualified on our business card. If you need to know which qualifications apply to a particular job, ask us before the work is booked.

Talk to us

Tell us about the job

Call, email or send the quote form. Tell us the suburb, what is there now and what you are planning.

Email shieldmatewaterproofing@gmail.com